Skip to content
This repository has been archived by the owner on Jul 24, 2021. It is now read-only.

Potlatch 2 fails under-construction tram lines #4259

Closed
openstreetmap-trac opened this issue Jul 23, 2021 · 2 comments
Closed

Potlatch 2 fails under-construction tram lines #4259

openstreetmap-trac opened this issue Jul 23, 2021 · 2 comments

Comments

@openstreetmap-trac
Copy link

Reporter: Will Pittenger
[Submitted to the original trac issue database at 11.07am, Friday, 2nd March 2012]

If you take a look at [http://www.openstreetmap.org/browse/way/140743936 way 140743936], you will see that Potlatch 2 only draws the one-way arrows. This isn't right. It should draw more. My idea would be to draw the normal tram line marker fading in and out, preferably out of synch with the one-way arrows (when present).

@openstreetmap-trac
Copy link
Author

Author: stevage
[Added to the original trac issue at 4.17am, Saturday, 3rd March 2012]

P2 doesn't support any construction=/proposed=. Those tags are a real PITA for the current map_features implementation.

@openstreetmap-trac
Copy link
Author

Author: stevage
[Added to the original trac issue at 5.45am, Saturday, 3rd March 2012]

(Whoops, was confused between render styles and map_features there).

Fixed (along with construction=subway and construction=light_rail)
systemed/potlatch2#32

Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.
Projects
None yet
Development

No branches or pull requests

1 participant