You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
This repository has been archived by the owner on Jul 24, 2021. It is now read-only.
Reporter: Larry0ua [Submitted to the original trac issue database at 9.04am, Thursday, 16th April 2015]
I recently noticed that when user leaves the message on the changeset I am interested in (either my changeset or changeset I've commented before) I receive an email where changeset link and the message text are both correct, but the date of the changeset and its comment are from other my changeset and are irrelevant.
See an attachment for the details: the first/second red underlines information irrelevant to the third underline (changeset link)
The text was updated successfully, but these errors were encountered:
Author: TomH [Added to the original trac issue at 9.58am, Thursday, 16th April 2015]
I can't see any problem here. The link is to changeset 17864507 and that comment does indeed exist on that changeset and was left at that time and that is the title of the changeset.
See https://www.openstreetmap.org/changeset/17864507 where the title of the changeset is indeed "fix routing graph connectivity - UA-W" and the time of the first comment (hover over the time to see the exact value) is indeed 05:20 on 15th April.
Possibly the only real error is that the first line might be better phrased as:
"Sanjak left a a comment at 2015-04-15 05:20:23 UTC on your changeset titled 'fix routing graph connectivity - UA-W'"
Currently you might expect the time to be the time of the changeset rather than the comment due to the way it is phrased.
Reporter: Larry0ua
[Submitted to the original trac issue database at 9.04am, Thursday, 16th April 2015]
I recently noticed that when user leaves the message on the changeset I am interested in (either my changeset or changeset I've commented before) I receive an email where changeset link and the message text are both correct, but the date of the changeset and its comment are from other my changeset and are irrelevant.
See an attachment for the details: the first/second red underlines information irrelevant to the third underline (changeset link)
The text was updated successfully, but these errors were encountered: