You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
This repository has been archived by the owner on Jul 24, 2021. It is now read-only.
Reporter: styno[at]hotmail.com [Submitted to the original trac issue database at 4.18pm, Sunday, 10th February 2008]
The current redo option copies all tags from the previously selected item (way or node) to the new selected item. Some tasks (i.e. add a new name tag or cycle route number) require to do a single edit on multiple ways so it would be nice to have a redo that executes the last edit to the new selected item.
The text was updated successfully, but these errors were encountered:
Reporter: styno[at]hotmail.com
[Submitted to the original trac issue database at 4.18pm, Sunday, 10th February 2008]
The current redo option copies all tags from the previously selected item (way or node) to the new selected item. Some tasks (i.e. add a new name tag or cycle route number) require to do a single edit on multiple ways so it would be nice to have a redo that executes the last edit to the new selected item.
The text was updated successfully, but these errors were encountered: